Publish a data flow
After you configure or modify a data flow, you must publish it for the changes to take effect. This prevents the deployment of unconfirmed modifications.
Log in to DMS 5.0.
-
In the top navigation bar, choose .
NoteIf you use the DMS console in simple mode, move the pointer over the
icon in the upper-left corner and choose . -
Click the target data flow to open its details page.
Optional: Perform a try run.
In the upper-left corner of the canvas, click Try Run.
In the Alert dialog box, click OK.
Click a blank area on the canvas. Then, at the bottom of the page, click the Execution Logs tab to check the status of the try run.
If the last line of the execution log shows
status SUCCEEDED, the try run succeeded.If the last line of the execution log shows
status FAILED, the try run failed.NoteTo stop the try run before it completes, click Stop Running in the upper-left corner of the canvas.
If the try run fails, review the execution log to find the failed node and its cause. Then, modify the node configuration and try again.
Publish the data flow.
In the upper-left corner of the canvas, click Publish.
In the Publish dialog box, enter a comment in the Remarks field, and then click OK to publish the data flow.
NoteTo stop scheduling the data flow, unpublish it:
In the upper-left corner of the canvas, click Unpublish.
In the confirmation dialog box, click OK to unpublish the data flow.
Required: Confirm the publishing status.
In the upper-right corner of the canvas, click Go to O&M.
On the right side of the page, check the publishing status of the data flow.
Published: The data flow has been published.
Not published: The data flow has pending edits and is not published.