Data transformation limits
Limits and quotas for data transformation in Simple Log Service.
Task configuration
|
Limit |
Description |
|
Number of tasks |
You can create up to 100 data transformation jobs in one project. Important
A job consumes quota even when stopped or completed. To reduce quota usage, delete stopped, completed, or unused jobs. For more information, see Manage data transformation jobs. If you need a higher quota, submit a ticket. |
|
Source data LogStore consumer group dependencies |
Each data transformation job uses one consumer group from its source LogStore. While a job is running, do not delete or reset the checkpoint for its dependent consumer group. Otherwise, the job restarts data consumption from the configured start time and may produce duplicate output. Important
The job updates its shard consumption progress to the dependent consumer group at regular intervals. As a result, the GetCheckPoint API for this consumer group does not reflect the latest processing progress. For accurate progress, check the Shard consumption latency module in the Data Transformation Dashboard. For more information, see How data transformation works, Glossary, and Consumer group APIs. |
|
Number of source LogStore consumer groups |
You can create up to 30 consumer groups in one LogStore. Therefore, one source LogStore can support up to 30 data transformation jobs. For more information, see Basic resource limits. If this limit is exceeded, jobs fail to run after they are started. For details on error messages, see How to view error logs. Important
Simple Log Service does not automatically delete consumer groups from stopped or completed jobs. To free up consumer groups, delete stopped, completed, or unused jobs. For more information, see Manage data transformation jobs. |
|
Modifying the time range of a running job |
After you modify the time range for a running job, the job starts processing from the new start time and handles all data within the new time range.
|
|
Number of output destinations |
You can configure up to 20 static output destinations in one data transformation job. If you use a single static output destination and dynamically specify the project and LogStore in your transformation code, you can write to up to 200 destinations. Data written to additional destinations beyond this limit is dropped. |
Data transformation
|
Limitations |
Description |
|
Quick preview |
Quick preview helps debug transformation code, with the following limits:
The Advanced preview feature has no such limits. |
|
Runtime concurrency |
The maximum runtime concurrency of a data transformation job equals the number of read/write shards in its source LogStore. For more information, see How data transformation works. For LogStore shard limits, see Basic resource limits. For how to split shards, see Manage shards. Important
|
|
Data load per concurrent unit |
The data load per concurrent unit depends on the data size in the source LogStore shard. Uneven data distribution across shards can create hot spots that cause processing delays. If the source data uses KeyHash routing, distribute keys across shards evenly to reduce imbalance. |
|
Memory usage |
Each concurrent unit has a 6 GB memory limit. Exceeding it degrades job performance and causes processing delays. This limit is typically exceeded when too many LogGroups are pulled in one batch. Adjust the advanced parameter Important
The default (and maximum) value for the advanced parameter |
|
CPU usage |
Each concurrent unit has a CPU limit of 100%. To meet higher CPU requirements, increase the concurrency limit. |
|
Dimension table data volume |
Dimension tables support up to two million entries and 2 GB of memory. Data exceeding these limits is truncated. Affected functions include res_rds_mysql, res_log_LogStore_pull, and res_oss_file. Important
If a job uses multiple dimension tables, they share this limit. Keep dimension table data as small as possible. |
Result data writing
|
Limit |
Description |
|
Writing to destination LogStore |
Warning
Do not configure the destination store as the current source store (same-source configuration). Otherwise, logs may be written in a loop, which incurs additional storage and traffic costs. You are responsible for the resource consumption and costs incurred. When writing processed results to a destination LogStore, follow the LogStore write limits. For details, see Basic resource limits and Data read and write. If you use the e_outputLogStoreut function and specify the You can identify this limit using task logs. See How to view error logs. Important
When a data transformation job hits a destination LogStore write limit, it retries indefinitely to ensure data integrity. However, this affects job progress and causes processing delays for the current source shard. |
|
Cross-region transmission |
Cross-region data transmission over a public network endpoint may encounter network errors that delay data transformation jobs. For Simple Log Service endpoints, see Service endpoints. Enable transfer acceleration for the destination project and configure its transfer acceleration endpoint in your data transformation job to improve network stability. For more information, see Manage transfer acceleration. |